Klient
Water treatment plant Želivka a.s. (Voda Želivka, a.s.)
Datum realizace
2020 - 2022
Investiční náklady
117 miles. CZK excl. VAT
The object of construction was the installation of four sets of a small hydroelectric power plant. In each of the water reservoirs Jesenice 1 and Jesenice 2, 2 sets with a Francis turbine were installed in the existing inflow armature chambers to drive the generator for power generation. The total power of the MVE was 1 MW.
Within the scope of this contract, the technical supervision of the builder and the activities of the OSH coordinator in the implementation of a small hydroelectric power plant were ensured.