PPO Trebovka

Adjustment of flow and affected bridge objects.

Klient

Elbe press, enterprise

Datum realizace

2019 - 2023

Investiční náklady

544 miles. CZK excl. VAT

The objective of the supervised construction action was to increase the level of flood protection with a length of 5,175 meters. The implementation saw an increase in the flood protection rate from Q5 to the proposed flow rate of Q50 transformed by a system of retention measures in the upper part of the watershed. The construction required 17 transpositions of water pipes and 22 transpositions of gas pipelines in the villages of Rybník and Třebovice.