Flood protection of the city of Olomouc

Ensuring the technical supervision function of the builder for 3 stages of the implementation of flood control measures in the years 2008 -2022

Klient

The Morava Basin, s.p.

Datum realizace

2022

Investiční náklady

1411 miles. CZK without VAT

The flood protection of the city of Olomouc takes place in stages:

- I. Stage until 2008

- Stage II.A - increasing the capacity of the Morava riverbed until 2013

- Stage II.B - increasing the capacity of the Morava riverbed until 2022

‍

‍