Klient
South Bohemian Water Supply Association
Datum realizace
2015 - Present
Investiční náklady
Stage I 326 miles. CZK excl. VAT, stage II 188 mil. CZK without VAT, Stage III 413 million. CZK without VAT
In Stage I, a complete translation of the existing line outside the built-up area of the village of Doudleby is proposed. The route runs in the floodplain of the Malše River in unpaved rocks with a high groundwater level and partly also in the riverbed. This stage has a length of 1.6 km and is the most technically complicated of all.
Stage II involves the doubling of the raw water line from the portal of the pier no.2 (Plav) to the connection point in front of the ÚV Plav. The length of the stage is 1293m. The route is led from the portal by a single-arm ditch of dimension DN 1000 under the Malší river, when after about 86 m it ends in an exit shaft.
Stage III is the longest, with a total of 3.7 km. Like stage II, the series is stored in concurrency with the DN 1400 feed series. Between Stage I and III, a bridge with a length of almost 1000 m and dimension DN2400 is built on the supply line. At the ends of the stele are the portal objects No. 1 (Doudleby) and No. 2 (Plav).