Klient
Association of Municipalities of CHOPOS
Datum realizace
2016-2022
Investiční náklady
—
The object of the project was to build a group water pipeline CHOPOS. The source for the group water supply is a shaft feeder from Želivka. The connection of the group water supply by the village of CHOPOS to the shaft feeder is contemplated in the existing building of the sloping inlet substation near the village of Křešice. Part of the construction was a two-chamber water tank with an accumulation of 600 m! 3 main, storage and distribution lines, ATS, modifications and additions in 3 existing water tanks and 746 water connections for a total length of 49.03 km.
- Feasibility studies and project documentation at all stages
- Engineering activities to ensure the issuance of a zoning decision, including property law deliberation
- Engineering activities to ensure the issuance of a building permit
- Processing of the grant application from the OPŽP program and ensuring the issuance of RoPD and RA, elaboration of the sustainability model
- Activities of the grant administrator during construction in the ISKP14+ environment
- Performance of the function of technical supervision of the investor
- Performance of the OSH coordinator
- Ensuring the application for approval of the work and putting the work into permanent operation
- Preparation and submission of the final evaluation of the subsidy