The project was divided into the following stages:
- Stage A – Updating and preparation of Flood Hazard and Flood Risk Maps
- Stage B – Proposals for effective flood protection measures
- Stage C – Preparation of documentation for areas with significant flood risk
- Stage D – Preparation of background materials for the Flood Risk Management Plan