Klient
City Chýně
Datum realizace
2017-2024
Investiční náklady
—
VDJ Chýně with an accumulation capacity of 2x1500m³ including the establishment of necessary short interconnection lines. Mechanical technological and electrical equipment of the water tank was carried out.
Activities: TDI and OSH