Water supply, sewerage and intensification of the Týnec nad Sázavou WWTP

The focus of the activities was the intensification of the existing wastewater treatment plant with a capacity of 6600 EO to a newly designed capacity of 8000 EO, the design of a water pipeline in the local parts of Pecerady and the design of a water pipeline and pressure sewer in the local part of Krusičany in the town of Týnec nad Sázavou

Klient

City Týnec nad Sázavou

Datum realizace

2019—2024

Investiční náklady

348 miles. CZK without VAT

As part of the proposal for intensification of the existing wastewater treatment plant with a capacity of 6600 EO to a newly designed capacity of 8000 EO, the transfer of part of the DN1000 trunk sewer, two relief chambers, mechanical pretreatment object, circulation activation object, anoxic selector, sludge stabilization tank, OSS sludge sanitization, reconstruction of the operating building, sludge drainage buildings and blowers were proposed and other related objects (area pipe connections, gas stations, metering objects, blowers, technology, wiring, paved areas, fencing, etc.)

The proposed water supply in the local parts of Pecerady and ZboKostelec includes storage and distribution lines from PE De63-110 pipes with a total length of 12.3 km, a total of 396 water connections, a pumping station of ČS Pecerady, two reduction shafts and one distribution water meter shaft. The water pipeline also included the design of the underground monolithic water tank VDJ Pecerada with a volume of 2 x 100 m3, including the fenced area of the VDJ, paved areas, turnstiles, driveways and NN connections.

The proposed water supply in the local area includes storage and distribution series of PE De63-110 pipes with a total length of 6.37 km, a total of 100 water connections, a water meter shaft and an above-ground object ATS Krusičany. The proposed sewage system includes pressure sewer series PE De63-110 with a total length of 5.84 km, a total of 100 pcs of sewer pressure connections, incl. DČJ and central building ČS Krusičany.

The content of the contract was the elaboration (securing) of the following parts:

· Project documentation at all stages of preparation. WPP subcontracted.

· Engineering activities — ensuring the final zoning decision and building permit

· Author supervision (AD) and technical supervision of the builder (TDS) (construction of the WWTP)

· Health and Safety Coordinator (construction of a wastewater treatment plant)