Klient
Water supply and sewerage Náchod a.s.
Datum realizace
2017 - so far
Investiční náklady
447 miles. CZK excl. VAT
The subject of the performance is the elaboration of project documentation and related engineering activities of the event: “Strengthening the capacity and security of the East Bohemian water system Náchod - Hradec Králové”. Part of the upcoming construction is construction and technological modifications of the main water tank, modifications of the source, expansion of water reservoirs and construction of a new water tank. In parallel, the replacement and construction of the supply line DN 500, 600 with a length of about 16.6 km is proposed.
IO 03 Supply line Vysoká Srbská — branch VDJ Branka III