Klient
City Říčany
Datum realizace
2018-2024
Investiční náklady
133 miles. CZK excl. VAT
ČOV Říčany provides wastewater treatment from the town of Říčany and the local parts of Pacov, Radošovice and Strašín. The sewage system of the Říčany wastewater treatment plant consists mainly of a historical unified sewage system, the new development of Říčany and the local parts is already drained by a separate system. The existing Říčany wastewater treatment plant was at the limit of its capacity possibilities, and therefore it is no longer possible to allow the connection of other wastewater producers. The aim of the project was to increase the capacity of the wastewater treatment plant to 20,600 EO.
Within the scope of the contract, an application for a subsidy was submitted, technical supervision of the builder and the activities of the OSH coordinator were ensured, technical assistance was provided in permitting the alteration of the construction before completion, test operation and control of compliance with the terms of the subsidy. Subsequently, the approval was secured and the documents for the accounting of the SFŽP subsidy were prepared.