Capacity building of Říčany WPP

Submission of the grant application, the performance of technical supervision of the builder and the activities of the OSH coordinator. Subsequent securing of approval and final evaluation of the event.

Klient

City Říčany

Datum realizace

2018-2024

Investiční náklady

133 miles. CZK excl. VAT

ČOV Říčany provides wastewater treatment from the town of Říčany and the local parts of Pacov, Radošovice and Strašín. The sewage system of the Říčany wastewater treatment plant consists mainly of a historical unified sewage system, the new development of Říčany and the local parts is already drained by a separate system. The existing Říčany wastewater treatment plant was at the limit of its capacity possibilities, and therefore it is no longer possible to allow the connection of other wastewater producers. The aim of the project was to increase the capacity of the wastewater treatment plant to 20,600 EO.

Within the scope of the contract, an application for a subsidy was submitted, technical supervision of the builder and the activities of the OSH coordinator were ensured, technical assistance was provided in permitting the alteration of the construction before completion, test operation and control of compliance with the terms of the subsidy. Subsequently, the approval was secured and the documents for the accounting of the SFŽP subsidy were prepared.

Realize your project with experts

Our experience and many years of practice in the field guarantee that your project will be implemented with maximum precision and consideration for sustainability.